The project involves a proposed protective wall construction to repair the banks of the banks for Sg. Kurau about 250 m long who have experienced severe erosion. JPS was asked to repair the banks in the area immediately because the State Government is undertaking a programme of restructuring settlements in the area. At this time the design has been prepared by the design and dam did Malaysia.