Behrang, 8 May 2019 - Handover of Contruction Project - Calibration Testing House Under Utility Utilization Equipment And Other Related Works at INSTUN. The JPS director of Perak as the Project Superintendent signed the submission document and handed the key to the Director of INSTUN as the project owner.
HAND OVER CEREMONY OF HOUSE OF CALIBRATION TESTING UNDERGROUND UTILITY EQUIPMENT CONTRUCTION PROJECT.
Tags: News