Last Updated: 20 November 2024.
331224 Visitors

MENTERI BESAR PERAK PROGRAM WITH THE PEOPLE

Hits: 246

gambar1   gambar2   gambar2

17 January 2022, Ipoh - YAB Menteri Besar Perak went down to the field to inspect the Sungai Pari Water Pump Construction Site at Kg Manjoi Gate, Jalan Tali Api Kg Manjoi Flood Hotspot Site and listened to a briefing on the Sungai Kinta Flood Mitigation Project and the proposed Sungai Tapah Tire Construction Project.

gambar4     gambar5     gambar6

gambar7     gambar8     gambar9

Tags: News