Federal Projects Division of Perak

Role

  • Implementing projects under the Federal Government Allocation.
  • Ensuring that projects implemented, such as flood mitigation structures (flood retention ponds, pump houses, trash traps, river embankments/berms), river repairs, coastal erosion, dams, and so on, function as designed, are always in good and perfect condition during the defect liability period before they are handed over to the relevant department/agency.
  • Ensuring the installation of mechanical and electrical structures according to the standards of the Department of Occupational Safety and Health (DOSH), the Electricity Supply Act, and other relevant agencies that are still in force.
  • Implement project monitoring and evaluation (in accordance with SPP II Prime Minister's directive 2007) as well as the preparation of reports for completed projects.
  • Implement/evaluate the impact and output of completed projects.
mds-smll
  • Tingkat 4 & 5, Bangunan Seri Perak Darul Ridzuan,
    Jalan Panglima Bukit Gantang Wahab,
    30000 Ipoh, Perak Darul Ridzuan

  • 605-209 5000
  • 605-254 0290
  • jpspk[at]perak[dot]gov[dot]my
freecounter


Kemaskini Terakhir: 24 June 2025.

© 2025 Jabatan Pengairan dan Saliran Negeri Perak

MYHRMIS MOBILE