Last Updated: 25 April 2024.
307768 Visitors

DIRECTOR'S VISIT TO PLSB PROJECT PHASE 1, LIVING RIVER-BIKE TRAIL.

Hits: 557

gambar1   gambar2   gambar3

Kuala Kangsar,  15 July 2020 -  Visit of Y.Bhg. Dato' Ir. Dr. Hj. Ahmad Anuar Bin Othman, Director of JPS Perak together with Perak PPP Project Engineer, Puan Ir. Hajah Azizah Mohd Sabri and Kuala Kangsar / Hulu Perak District Engineer, Hj Abd. Aziz bin Mohamed Yusof to PLSB Phase 1 Project, Living River-Bike Trail from Cenderoh to Victoria Bridge, Kuala Kangsar, Perak.

gambar4   gambar5   gambar6

gambar7   gambar8   

gambar9   gambar10

Tags: News