MENTERI BESAR PERAK PROGRAM WITH THE PEOPLE

gambar1   gambar2   gambar2

17 January 2022, Ipoh - YAB Menteri Besar Perak went down to the field to inspect the Sungai Pari Water Pump Construction Site at Kg Manjoi Gate, Jalan Tali Api Kg Manjoi Flood Hotspot Site and listened to a briefing on the Sungai Kinta Flood Mitigation Project and the proposed Sungai Tapah Tire Construction Project.

gambar4     gambar5     gambar6

gambar7     gambar8     gambar9

Operation Hour

Monday -
Thursday
Office Hours: 8.00 am - 5.00 pm Break: 1.00 pm - 2.00 pm
Friday Office Hours: 8.00 am - 12.15 pm 2.45 pm - 5.00 pm Break: 12.15 pm - 2.45 pm
Saturday &
Sunday
Close

Visitor Statistics

  • Today256
  • Yesterday176
  • This Week3795
  • This Month10092
  • Total130073
mds-smll
  • Tingkat 4 & 5, Bangunan Seri Perak Darul Ridzuan,
    Jalan Panglima Bukit Gantang Wahab,
    30000 Ipoh, Perak Darul Ridzuan

  • 605-209 5000
  • 605-254 0290
  • jpspk[at]perak[dot]gov[dot]my

Last Updated : 14 May 2026.

© 2026 Department of Irrigation and Drainage, State Of Perak