ACTIVITY TO INSPECT THE CONDITION OF THE EMBANKMENT BY THE DIRECTOR OF THE PERAK STATE IRRIGATION AND DRAINAGE DEPARTMENT UNDER THE BANK STABILIZATION PROJECT ALONG THE PARI RIVER, KINTA DISTRICT.

ACTIVITY TO INSPECT THE CONDITION OF THE EMBANKMENT BY THE DIRECTOR OF THE PERAK STATE IRRIGATION AND DRAINAGE DEPARTMENT UNDER THE BANK STABILIZATION PROJECT ALONG THE PARI RIVER, KINTA DISTRICT.
 
February 8, 2025, Ipoh - Director of the Perak State Irrigation and Drainage Department, YBrs Ir. Dr. Asnor Muizan bin Dato' Haji Ishak inspected the condition of the embankment under the Slope Stabilization Project along the Pari River, Kinta District, by cycling from the Northern Region Human Capital Development Institute, JPS Malaysia in Kg. Temiang this afternoon.

Also present with the PPSN were the Senior Assistant Director, Water Resources, Hydrology and Dams Division, and the Senior Assistant Director, Mechanical and Electrical Services Division, JPS Perak.
 
1     2     3
 
4     5
 

Operation Hour

Monday -
Thursday
Office Hours: 8.00 am - 5.00 pm Break: 1.00 pm - 2.00 pm
Friday Office Hours: 8.00 am - 12.15 pm 2.45 pm - 5.00 pm Break: 12.15 pm - 2.45 pm
Saturday &
Sunday
Close

Visitor Statistics

  • Today255
  • Yesterday176
  • This Week3794
  • This Month10091
  • Total130072
mds-smll
  • Tingkat 4 & 5, Bangunan Seri Perak Darul Ridzuan,
    Jalan Panglima Bukit Gantang Wahab,
    30000 Ipoh, Perak Darul Ridzuan

  • 605-209 5000
  • 605-254 0290
  • jpspk[at]perak[dot]gov[dot]my

Last Updated : 14 May 2026.

© 2026 Department of Irrigation and Drainage, State Of Perak