BRIEFING AND VISIT BY THE SPECIAL OFFICER TO THE CHIEF MINISTER, DUN BOTA TO THE IRRIGATION INFRASTRUCTURE UPGRADING PROJECT AND OTHER RELATED WORKS AT THE PERAK STATE IRRIGATION SCHEME (LEFT BOTA PUMP AND PENDIAT PUMP HOUSE – PHASE 1)
April 22, 2026, Perak Tengah – A site visit to the Irrigation Infrastructure Upgrade Project at Pam Bota Kiri and Pendiat Pump House (Phase 1) was held this morning with the Special Officer to the Chief Minister, Ms. Sarah Syazwani Saari.
This visit was also attended by representatives from the Perak State Irrigation and Drainage Department, led by the Chief Engineer of the Mechanical and Electrical Services Division of the Perak JPS, Ir. Haji Roslan bin Hussin; District Engineer of JPS Perak Tengah, Mr. Zahid bin Zainal Abidin; Senior Assistant Director of the Mechanical and Electrical Services Division of JPS Perak, Mr. Muhd Zulkifli bin Idris, as well as officers from JPS Perak.
This visit aims to review the progress of the Irrigation Infrastructure Upgrade Project at Bota Kiri Pump and Pendiat Pump House (Phase 1) and to provide an explanation to the Chief Minister's Special Officer regarding the scope of work and the current status of the project.
| Monday - Thursday |
Office Hours: 8.00 am - 5.00 pm Break: 1.00 pm - 2.00 pm |
| Friday | Office Hours: 8.00 am - 12.15 pm 2.45 pm - 5.00 pm Break: 12.15 pm - 2.45 pm |
| Saturday & Sunday |
Close |
© 2026 Department of Irrigation and Drainage, State Of Perak