Last Updated: 17 April 2024.
306217 Visitors

Repair the Edge of Sungai Kurau's at Kg. King Kuala Kurau, Bashah, Kerian District

Hits: 1115

The project involves a proposed protective wall construction to repair the banks of the banks for Sg. Kurau about 250 m long who have experienced severe erosion.  JPS was asked to repair the banks in the area immediately because the State Government is undertaking a programme of restructuring settlements in the area. At this time the design has been prepared by the design and dam did Malaysia.

gallery

gallery